Stormwater Compliance in Houston, TX

Stack of stormwater quality permit and renewal paperwork

If you own or manage a commercial site in the City of Houston or Harris County, stormwater compliance isn’t a one-time box to check. It’s a permit that has to be renewed every year, features that have to be inspected and maintained, and paperwork that has to match what’s in the ground. Stormwater Professionals Group handles all of it, from the first SWPPP on a construction site to the annual SWQ permit renewal years after the building opens.

Call (832) 554-6654 to schedule a site assessment.

Which permits apply to your site

Most sites in the area fall under one or more of these:

City of Houston SWQ Permit

Who issues it: City of Houston
When it applies: Sites that meet the City’s definition of “new development” or “significant redevelopment” (City Code Sec. 47-601)
Renewal: Every year, for the life of the site

Harris County SWQ Permit

Who issues it: Harris County (Office of the County Engineer)
When it applies: Projects inside the County’s jurisdiction that the Civil Development Plan Review finds are new or significant redevelopment
Renewal: Every year, on or before the anniversary of the Certificate of Compliance

Construction General Permit (TXR150000)

Who issues it: TCEQ
When it applies: Construction that disturbs 1 acre or more, or is part of a larger common plan of development that does
Renewal: For the life of the construction project

Multi-Sector General Permit (TXR050000)

Who issues it: TCEQ
When it applies: Certain industrial facilities, based on SIC code
Renewal: Per TCEQ permit terms

Not sure which ones apply to you? Send us the address and we’ll tell you.

City of Houston SWQ permits

The City of Houston requires a Stormwater Quality permit for sites that meet its definition of new development or significant redevelopment. The permit stays with the site for its whole life, and the owner is responsible for it. Every year the owner has to renew it, keep a record of internal inspections, and amend the permit if ownership or the design changes.

A City renewal package includes:

  • The permit application with “Renewal” checked
  • The owner’s annual affidavit
  • An annual certification from a Texas-licensed professional engineer
  • Date-stamped photos of each permitted feature
  • For hydrodynamic separators, a waste manifest from the cleanout or an inspection report showing sediment is within the manufacturer’s limit

The City asks for the package at least 30 days before the permit expires. Since November 1, 2024, the Office of the City Engineer has been issuing violation notices to sites with expired permits.

Harris County SWQ permits

Outside the City limits, Harris County issues the SWQ permit through its Civil Development Plan Review. After construction, a Texas-licensed engineer submits an As-Built Certificate. The County inspects the feature, then issues a Certificate of Compliance. The site can’t operate the feature before that certificate is issued.

From then on, the permit renews every year on or before the anniversary of the Certificate of Compliance. Each renewal needs an annual P.E. inspection certification and the permittee’s certification of proper operation.

Silt fence sediment control along a construction site under an active SWPPP

Construction sites: SWPPPs under TXR150000

Before earthwork starts on a site that disturbs 1 acre or more, or is part of a larger common plan of development that does, the operator needs coverage under the TCEQ Construction General Permit (TXR150000) and a SWPPP on site. We prepare site-specific SWPPPs, help file the Notice of Intent and Notice of Termination, and keep the plan current as the site changes. Details are on our SWPPP preparation and compliance page.

A SWPPP covers the construction phase. Once the site is built, the SWQ permit and its Stormwater Quality Management Plan (SWQMP) take over. Many projects need both, and we prepare SWQMPs too.

Industrial facilities

If your facility might need an industrial stormwater permit under the TCEQ Multi-Sector General Permit (TXR050000), our post Do I Need an Industrial SWPPP Permit? explains how to tell.

Inspections

Our staff has performed thousands of stormwater quality inspections on sand filters, drains, storm sewers, ponds and more. On our turn-key program, inspections are monthly. Every one is time- and date-stamped, photo-documented, and emailed to you the day of the inspection. If something needs fixing, you get a written assessment of the problem, how to repair it, and how to keep it from coming back. More on our stormwater quality inspection services.

Annual permit renewals

We founded our company on managing these permits. On our turn-key program we:

  • Prepare the renewal documents, including the owner’s affidavit and application
  • Coordinate the PE certification site visit
  • Take the required date-stamped and location reference photos
  • Submit the package with permit fees (fees are added to your invoice)
  • Track the renewal and send you the approved permit as soon as we receive it
  • Work with the enforcement office on your behalf if a renewal is rejected

If a feature needs cleanout, mowing, grading or repair before it can pass, regular customers get top priority so the permit doesn’t run late. See stormwater quality permit renewals for the full process, and our Houston SWQ permit resources for the City and County forms.

Who we work with

  • Property owners and property managers of commercial sites with SWQ permits. See our property management stormwater program.
  • General contractors and developers who need SWPPPs and permit coverage during construction
  • Civil engineers who need SWQMPs, plan review and maintenance input. We’re happy to do a lunch-and-learn for your engineering team.
  • HOAs, MUDs and utility districts
  • Public and private clients, served for over 10 years

Service area

We serve Houston, Harris County and the Texas Gulf Coast. We also have offices in Austin and San Antonio.

Frequently asked questions

Does my property need a stormwater quality permit?

If your site was built as new development or significant redevelopment under City of Houston or Harris County rules, it probably has an SWQ permit that must be renewed every year. The permit stays with the property, so a new owner takes it on and has to amend it. If you’re not sure, send us the address and we’ll check.

What’s the difference between a SWPPP and an SWQ permit?

A SWPPP covers erosion and sediment control while a site is under construction (TCEQ permit TXR150000). The SWQ permit and its SWQMP cover water quality after the site is built, and they’re renewed every year. Many sites need both at different stages.

When is the City of Houston SWQ renewal due?

The permit is valid for one year. The City asks for the renewal package at least 30 days before it expires. Harris County permits renew on or before the anniversary of the Certificate of Compliance.

What happens if my SWQ permit expires?

Since November 1, 2024, the City of Houston has been issuing violation notices to sites with expired permits. A site with an expired permit is discharging stormwater without a valid permit and may face enforcement. Late renewals also have to pay the missed fees.

Do I still need an SWQ permit if my facility has an industrial (MSGP) permit?

The City of Houston doesn’t require an SWQ permit for sites covered under the TCEQ Multi-Sector General Permit. Cancelling an existing local permit is up to the local authority, so talk to us or the City before you stop renewing.

Can you handle the whole process for us?

Yes. Our turn-key program covers monthly inspections, annual renewal paperwork, P.E. certification, submittals and tracking, so you don’t have to be involved unless you want to be.

Our services

Permits, plans, and compliance

Inspections

Pond maintenance and repair

Lift stations

Service areas and related

Get your site in compliance

Call (832) 554-6654, email info@swpgrp.com, or contact us to schedule a site assessment. Send us a copy of your SWQMP if you have one, and we’ll walk you through the system and what your permit requires.