
Stormwater Professionals Group provides an independent, stormwater-focused review of drainage, detention, and water-quality plans for projects across Houston, Harris County, and the greater Austin area. Because we prepare SWQMPs and SWPPPs ourselves, we know what City, County, and TCEQ reviewers look for, and we put that experience to work as a specialist second set of eyes on your stormwater design before it goes in for permitting.
Who plan review is for
- Engineering and design firms that want a stormwater specialist to review the drainage, detention, and water-quality scope of a submittal, so it clears City of Houston, Harris County, or Flood Control review with fewer comment cycles.
- Developers and owners who want confidence that a project’s stormwater design is complete and permit-ready before submittal, so the schedule is not lost to resubmittals.
- Teams working outside their home market that need a local read on Houston and Harris County stormwater criteria.
What we review
- Stormwater Quality Management Plans (SWQMP) against City of Houston (Infrastructure Design Manual, Chapter 13) and Harris County water-quality requirements, including pollutant identification, BMP selection and sizing, and the inspection and maintenance plan.
- Detention and drainage design against City of Houston and Harris County Flood Control District criteria, including detention volume, conveyance, and outfall.
- Stormwater Pollution Prevention Plans (SWPPP) against the TCEQ Construction General Permit (TXR150000), including erosion and sediment controls and BMP selection.
- Completeness of the stormwater submittal so it matches what the reviewing authority expects, including the PE-sealed drawings.
Our review process
You receive a written review memo with prioritized, stormwater-specific findings tied to the applicable City of Houston, Harris County, Flood Control District, and TCEQ criteria, with clear recommendations to get the plan permit-ready. We flag gaps in detention and water-quality design, BMP selection and sizing, and the supporting documentation. Standard turnaround is one to two weeks, and expedited review is available when a deadline is tight.
Need a plan prepared rather than reviewed? We also prepare SWQMPs and SWPPPs for projects across our service area.
Frequently asked questions
What does a stormwater plan review check?
We review the stormwater scope of a submittal: the SWQMP and its water-quality controls, the detention and drainage design, and the SWPPP for construction, checked against the City of Houston, Harris County, Flood Control District, and TCEQ criteria that apply. We keep the review focused on stormwater compliance and completeness, not structural, geotechnical, or other scopes outside our field.
Will you review a plan your firm did not prepare?
Yes. A third-party review is an independent look at another firm’s stormwater design. We are not there to redesign the plan, but to confirm it is complete and permit-ready and to flag issues before the reviewing authority does.
How long does a stormwater plan review take?
Standard turnaround is about one to two weeks, depending on the size and complexity of the plan set. Expedited review is available when a deadline is tight.
How is a plan review different from preparing the plan?
When we prepare a plan, we author the SWQMP or SWPPP for your project. When we review a plan, we check a plan someone else prepared. Because we prepare these plans ourselves, we know what reviewers look for, which is what makes the review useful.
Request a plan review or call (832) 554-6654.